KOHLER K-11184T Plumbing Product user manual

Observe all local plumbing and building codes.

Shut off the water supply.

Seat post holes are on 155mm (6-1/8") centers.

Passageways is 60mm (2-3/8").

Water depth from rim is 245mm (9-5/8")

Ensure that the new drain and shut-off valve have the correct roughing-in dimensions. See Fig.#1.

Be very careful while working with vitreous china products.

Vitreous china can break or chip if the bolts or nuts are overtightened, or if carelessly handled.

Carefully inspect the new fixture for any sign of damage.

Fixture dimensions are nominal and conform to tolerances established by ASME Standards (A112. 19.2M).

155mm(6-1/8")

60mm(2-3/8")

245mm(9-5/8")

ASME(A112. 19.2M)

1037406-T01-A

Copyright Kohler China Ltd., 2004

TOOLS AND MATERIALS REQUIRED

(Not supplied)

254mm adjustable wrench

Metal file (file cut)

Tape measure

Tubing cutter

Putty knife

Screwdriver

Straight pipe coupling

Connection packing

Toilet supply shut-off valve, 10mm (3/8") recommended

10mm(3/8")

WARNING: Risk of external leakage. The fill valve nut has been factory-tightened, wrench tighten 1/4 turn past finger tight.

NOTICE: If no shut-off valve exists, install a shut-off valve below the tank before installing the new toilet.

Flexible hose are recommended to connect the supply line to the fill valve. If you use a rigid connection, take care not to apply side forces to the bottom of the fill valve.

ROUGHING-IN

P-trap 8711T

INSTALLATION

1. REMOVE EXISTING TOILET

Turn off water supply. flush the toilet and use a sponge to remove the remaining water from the tank and bowl.

Disconnect the supply shut-off valve (if present) and remove the old tank and bowl.

1037406-T01-A

2. ASSEMBLE TANK BOLTS&WASHERS

Slip bolt heads into mounting plate on bottom of tank. Place large foam washer on base of flush valve. See Fig. #2a.

Place tank on bowl and attach with nuts and washers from under bowl. See Fig.#2b.

NOTE: Do not use white cement or high lime content cements to install this toilet. The expansion of cement due to a rise in temperature may make the toilet crack or cause damage. Kohler is not responsible for any damage caused by installation with the use of cement.

3. SELECT P-TRAP OR S-TRAP to installation your toilet according to the drain and shut-off valve's

Roughing-in dimensions.

S-trap installation

P-trap installation

1037406-T01-A

4. INSTALL THE TOILET & CONNECT WATER SUPPLY

Place the toilet in its final location. Use plastic drill guide and

8mm drill bit to drill floor mounting holes for installation over concrete. Use 4mm to 4.5mm drill for wood floor installation.

See Fig.#4a.

3 Install anchors and caps.

WARNING: Do not overtighten floor bolts, as damage to the vitreous can occur.

NOTE: Do not use white cement or high lime content cements to install this toilet. The expansion of cement due to a rise in temperature may make the toilet crack or cause damage. Kohler is not r